Backup Power & Peak Generation Project
Heavy industry plastics manufacturing facility was in need of a back-up power system to alleviate its exposure to rolling brown outs from the utility.
This project included installation of two (2) 2 Mega-Watt diesel generator units to meet their needs. The units were installed and remain ready when needed but also they are used during peak times to reduce their consumption from the utility and also generate power for sale to the utility.